UK TimesUK Times
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
What's Hot
Weapons-grade chemical carfentanil surges as dangerous substitute for fentanyl – UK Times

Weapons-grade chemical carfentanil surges as dangerous substitute for fentanyl – UK Times

18 April 2026

M4 eastbound between J19 and J18 | Eastbound | Vehicle Fire

18 April 2026
He’s just toying with them now! Gout Gout breezes to gold at the Australian Junior Championships – and offers a cheeky message to his rivals

He’s just toying with them now! Gout Gout breezes to gold at the Australian Junior Championships – and offers a cheeky message to his rivals

18 April 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
UK TimesUK Times
Subscribe
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
UK TimesUK Times
Home » Mytton Oak Road cabling work set to be completed in early May
News

Mytton Oak Road cabling work set to be completed in early May

By uk-times.com18 April 2026No Comments2 Mins Read
Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
Share
Facebook Twitter LinkedIn Pinterest Email
15/04/2026 – Permalink Related topics: Highways, transport and environmental maintenance / Partner organisations

High‑voltage cabling work on Mytton Oak Road, Shrewsbury linked to the Shropshire Homes housing development is now expected to be completed in early May [2026].

To reduce disruption options such as night‑time working or using land within Shrewsbury Hospital were explored with S & R Construction but ruled out due to timing, programme, and land ownership constraints. As a result work will continue along the original route.

Delays to the project have mainly been caused by difficult excavation conditions and the large number of existing underground services, as well as time spent assessing alternative approaches. Completing the first connection point is critical to support up to 30 new homes that are due to be occupied by September [2026].

Work will continue under temporary traffic signals during off‑peak hours only (9.30am to 4pm). Signals will be manually operated and removed daily, with arrangements closely monitored in liaison with the contractor and the hospital to minimise impacts on patients, staff, emergency vehicles and the public.

Work will be closely monitored by Shropshire Council to ensure that the early May deadline is met.

Share this page

mailto:?subject=Mytton Oak Road cabling work set to be completed in early May&body=https%3A%2F%2Fnewsroom.shropshire.gov.uk%2F2026%2F04%2Fmytton-oak-road-cabling-work-set-to-be-completed-in-early-may%2F

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email

Related News

Weapons-grade chemical carfentanil surges as dangerous substitute for fentanyl – UK Times

Weapons-grade chemical carfentanil surges as dangerous substitute for fentanyl – UK Times

18 April 2026

M4 eastbound between J19 and J18 | Eastbound | Vehicle Fire

18 April 2026

A66 eastbound access from A19 | Eastbound | Road Works

18 April 2026
Oil prices drop after Iran says Strait of Hormuz ‘completely open’ for passage of ships – UK Times

Oil prices drop after Iran says Strait of Hormuz ‘completely open’ for passage of ships – UK Times

18 April 2026

A3 southbound between A283 near Milford (south) and A333 | Southbound | Vehicle Fire

18 April 2026
Meghan Trainor drops album teaser after cancelling entire tour | Culture – UK Times

Meghan Trainor drops album teaser after cancelling entire tour | Culture – UK Times

18 April 2026
Top News
Weapons-grade chemical carfentanil surges as dangerous substitute for fentanyl – UK Times

Weapons-grade chemical carfentanil surges as dangerous substitute for fentanyl – UK Times

18 April 2026

M4 eastbound between J19 and J18 | Eastbound | Vehicle Fire

18 April 2026
He’s just toying with them now! Gout Gout breezes to gold at the Australian Junior Championships – and offers a cheeky message to his rivals

He’s just toying with them now! Gout Gout breezes to gold at the Australian Junior Championships – and offers a cheeky message to his rivals

18 April 2026

Subscribe to Updates

Get the latest UK news and updates directly to your inbox.

Recent Posts

  • Weapons-grade chemical carfentanil surges as dangerous substitute for fentanyl – UK Times
  • M4 eastbound between J19 and J18 | Eastbound | Vehicle Fire
  • He’s just toying with them now! Gout Gout breezes to gold at the Australian Junior Championships – and offers a cheeky message to his rivals
  • A66 eastbound access from A19 | Eastbound | Road Works
  • Oil prices drop after Iran says Strait of Hormuz ‘completely open’ for passage of ships – UK Times

Recent Comments

No comments to show.
© 2026 UK Times. All Rights Reserved.
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact Us

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version