UK TimesUK Times
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
What's Hot
UK-Italy Young Leaders Programme – GOV.UK

UK-Italy Young Leaders Programme – GOV.UK

19 March 2026
13 states are under investigation by RFK Jr’s HHS for ‘coercing’ doctors to perform abortions – UK Times

13 states are under investigation by RFK Jr’s HHS for ‘coercing’ doctors to perform abortions – UK Times

19 March 2026

A30 eastbound within the A391 near Bodmin (west) junction | Eastbound | Road Works

19 March 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
UK TimesUK Times
Subscribe
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
UK TimesUK Times
Home » Work to tackle pigeons under Shrewsbury railway bridge to be completed next year
News

Work to tackle pigeons under Shrewsbury railway bridge to be completed next year

By uk-times.com23 December 2025No Comments2 Mins Read
Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
Share
Facebook Twitter LinkedIn Pinterest Email
22/12/2025 – Permalink Related topics: Highways, transport and environmental maintenance / Partner organisations

Work to tackle the problem of pigeons nesting and fouling under Shrewsbury’s railway bridge is now set to be completed next year, after Network Rail identified the need for strengthening work on the bridge.

During the recent work at the railway station gyratory, Network Rail carried out work under the bridge on behalf of Shropshire Council to remove pigeon mess and install mesh to prevent pigeons from roosting.

Further work to install more mesh has now been delayed after a recent inspection of the bridge by Network Rail uncovered the need for remedial strengthening works to take place from March 2026 – which has delayed the final stage of the mesh work.

Neither Network Rail nor the council wants to undertake costly mesh work now that would then need to be taken down in 2026. Therefore, the mesh work will be completed at the same time as the bridge strengthening work – which should finally removal all the pigeons and their associated mess from the area.

Some pipe replacement work will be carried out at the same time, which should address the problem of water running down the walls.

Alex Wagner, deputy Leader of Shropshire Council and councillor for Quarry and Coton Hill (pictured), said:

“We’ve had a huge number of complaints about the pigeon mess on the bridge walls, both on the new paving and the newly resurfaced road, both before and since the first stage of Network Rail’s work was carried out in the summer. I completely share people’s frustrations and we are pushing for action as soon as possible.

“We had hoped the mesh installation work would be completed by now so it’s disappointing that work can’t now be completed until next year. But, I completely accept that it’s important that the strengthening work is carried out, and it makes sense to complete the mesh work at the same time, rather than doing it twice.

“Once complete, this work should finally solve the pigeon problem and remove their mess from the area, tackling an issue which has been present for a number of years – or possibly longer.”

Share this page

mailto:?subject=Work to tackle pigeons under Shrewsbury railway bridge to be completed next year&body=https%3A%2F%2Fnewsroom.shropshire.gov.uk%2F2025%2F12%2Fwork-to-tackle-pigeons-under-shrewsbury-railway-bridge-to-be-completed-next-year%2F Share via e-mail

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email

Related News

13 states are under investigation by RFK Jr’s HHS for ‘coercing’ doctors to perform abortions – UK Times

13 states are under investigation by RFK Jr’s HHS for ‘coercing’ doctors to perform abortions – UK Times

19 March 2026

A30 eastbound within the A391 near Bodmin (west) junction | Eastbound | Road Works

19 March 2026

A14 westbound between J18 and J17 | Westbound | Congestion

19 March 2026
Grace Ives, Girlfriend review – New York indie-rocker sounds braver than ever – UK Times

Grace Ives, Girlfriend review – New York indie-rocker sounds braver than ever – UK Times

19 March 2026

M54 eastbound between J1 and M6 | Eastbound | Congestion

19 March 2026
How long will the UK enjoy sunny weather – and will it stay warm this weekend? – UK Times

How long will the UK enjoy sunny weather – and will it stay warm this weekend? – UK Times

19 March 2026
Top News
UK-Italy Young Leaders Programme – GOV.UK

UK-Italy Young Leaders Programme – GOV.UK

19 March 2026
13 states are under investigation by RFK Jr’s HHS for ‘coercing’ doctors to perform abortions – UK Times

13 states are under investigation by RFK Jr’s HHS for ‘coercing’ doctors to perform abortions – UK Times

19 March 2026

A30 eastbound within the A391 near Bodmin (west) junction | Eastbound | Road Works

19 March 2026

Subscribe to Updates

Get the latest UK news and updates directly to your inbox.

Recent Posts

  • UK-Italy Young Leaders Programme – GOV.UK
  • 13 states are under investigation by RFK Jr’s HHS for ‘coercing’ doctors to perform abortions – UK Times
  • A30 eastbound within the A391 near Bodmin (west) junction | Eastbound | Road Works
  • Ex-WWE star facing decades behind bars after claims he ‘bought $1m home and boat with stolen welfare funds’
  • A14 westbound between J18 and J17 | Westbound | Congestion

Recent Comments

No comments to show.
© 2026 UK Times. All Rights Reserved.
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact Us

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version