UK TimesUK Times
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
What's Hot

A1 northbound between A1167 near Berwick-Upon-Tweed (south) and A698 | Northbound | Road Works

17 March 2026
Huw Edwards’ victim ‘ready to tell his story’ say drama producers – UK Times

Huw Edwards’ victim ‘ready to tell his story’ say drama producers – UK Times

17 March 2026

A1 southbound between A698 and A1167 near Berwick-Upon-Tweed (south) | Southbound | Road Works

17 March 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
UK TimesUK Times
Subscribe
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
UK TimesUK Times
Home » What caused the Audenshaw freight train derailment? | Manchester News
News

What caused the Audenshaw freight train derailment? | Manchester News

By uk-times.com30 December 2025No Comments3 Mins Read
Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
What caused the Audenshaw freight train derailment? | Manchester News
Share
Facebook Twitter LinkedIn Pinterest Email
RAIB A grey freight train stopped on train tracks surrounded by greeneryRAIB

The train came off the tracks near Sidmouth Street in Audenshaw

A freight train derailed due to undetected “failed” screws on the track, an investigation has found.

The train came off the tracks near Sidmouth Street, in Audenshaw, Greater Manchester, on 6 September 2024.

The incident was caused by the failure of multiple screws, which caused the track to widen, an investigation and report by the Rail Accident Investigation Branch (RAIB) concluded. The RAIB has made eight recommendations to prevent a similar incident in future.

Network Rail says it “fully accepts” the findings of the RAIB report and that repairs and safety work have been completed at the bridge.

What happened?

At about 11:25 BST on the day of the derailment, the freight train came off the tracks as it crossed a bridge carrying the railway over a public footpath in Audenshaw.

The derailment involved nine of the train’s 24 fully laden wagons and led to extensive damage to the track, the bridge and some of the wagons.

No one was injured during the accident, but the railway at this location was closed for about eight weeks while repairs took place.

RAIB A hand holding a large screw that appears to be damaged on the end RAIB

The derailment was caused by the failure of multiple screws

The railway tracks over the bridge were installed on a non-typical longitudinal bearer system (LBS), the report said.

The report concluded the derailment was caused by a “loss of track gauge restraint”, which caused the distance between the tracks to widen and allowed the wagons’ wheels to drop from the rails.

This was traced back to the failure of multiple screws, the report said.

The investigation found the screws had suffered fatigue damage before the derailment. Inspection and maintenance records confirmed at least three previous screw failures, including one before 2020, in the same location.

However, many records were unavailable and the lack of proper reporting and recording allowed these issues to go unaddressed, the RAIB found.

The investigation also found that those screws which had failed, or were failing before the passage of the train, had not been detected by Network Rail’s inspection regime.

This was because both the automated and manual inspection regimes were not capable of reliably detecting this type of failure.

The driver had two years’ experience of working as a train driver and no issues were identified with how the train was being driven at the time of the incident, the RAIB said.

Future prevention

The RAIB makes eight recommendations, including “managing the competence” of staff who manage the tracks and ensuring better records of inspections and reporting of component failures.

“There were two underlying factors. Network Rail did not have effective processes for managing LBS assets, in regard to their design assurance, installation, inspection and maintenance,” the RAIB said.

“The track team in the maintenance unit responsible for the LBS at this bridge had neither recorded, nor reported, previous screw failures, and this had not been identified nor corrected by Network Rail’s assurance regime over a period of years.”

Network Rail said it fully accepted the findings of the RAIB report.

“Repairs and safety work at this bridge have been completed and Network Rail has also introduced enhanced inspection and maintenance regimes at similar locations across the region to remove any potential safety risks,” a spokesperson said.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email

Related News

A1 northbound between A1167 near Berwick-Upon-Tweed (south) and A698 | Northbound | Road Works

17 March 2026
Huw Edwards’ victim ‘ready to tell his story’ say drama producers – UK Times

Huw Edwards’ victim ‘ready to tell his story’ say drama producers – UK Times

17 March 2026

A1 southbound between A698 and A1167 near Berwick-Upon-Tweed (south) | Southbound | Road Works

17 March 2026
How wheelchair basketball challenges assumptions about the gender gap in sport – UK Times

How wheelchair basketball challenges assumptions about the gender gap in sport – UK Times

17 March 2026

M1 southbound within J32 | Southbound | Congestion

17 March 2026

M53 J5 northbound access | Northbound | Road Works

17 March 2026
Top News

A1 northbound between A1167 near Berwick-Upon-Tweed (south) and A698 | Northbound | Road Works

17 March 2026
Huw Edwards’ victim ‘ready to tell his story’ say drama producers – UK Times

Huw Edwards’ victim ‘ready to tell his story’ say drama producers – UK Times

17 March 2026

A1 southbound between A698 and A1167 near Berwick-Upon-Tweed (south) | Southbound | Road Works

17 March 2026

Subscribe to Updates

Get the latest UK news and updates directly to your inbox.

Recent Posts

  • A1 northbound between A1167 near Berwick-Upon-Tweed (south) and A698 | Northbound | Road Works
  • Huw Edwards’ victim ‘ready to tell his story’ say drama producers – UK Times
  • A1 southbound between A698 and A1167 near Berwick-Upon-Tweed (south) | Southbound | Road Works
  • How wheelchair basketball challenges assumptions about the gender gap in sport – UK Times
  • M1 southbound within J32 | Southbound | Congestion

Recent Comments

No comments to show.
© 2026 UK Times. All Rights Reserved.
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact Us

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version