UK TimesUK Times
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
What's Hot

From Startup to Space Oxford Space Systems’ Journey to Oberon – Case study

9 September 2025

link road from A13 eastbound to A1089 southbound | Eastbound | Road Works

9 September 2025

College football player kicked off team for ‘stealing designer bag with $228k Rolex and $25K worth of clothes’

9 September 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
UK TimesUK Times
Subscribe
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
UK TimesUK Times
Home » Project to improve River South Esk moves into next stage
Money

Project to improve River South Esk moves into next stage

By uk-times.com9 September 2025No Comments3 Mins Read
Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
Share
Facebook Twitter LinkedIn Pinterest Email

Our new Dalkeith mine water treatment scheme has reached a significant phase in its development, with excavation works now under way and key construction milestones successfully completed.

Following the site clearance, surveys, ground stabilisation and setup of construction facilities, the project – being built by the Mining Remediation Authority as part of our work to make a better future for people and the environment in coalfield areas of Scotland – is moving into its next stage.

Now the community is being invited to preview the final design through an interactive virtual tour and have a say on the landscaping of the finished scheme, as well as find out more about what works are planned later this year.

Josh Turner, of the Mining Remediation Authority’s community response and stakeholder engagement team, said

We’re really excited to welcome the people of Dalkeith to our drop-in event at the town’s library on Thursday 25 September. It’s a great chance to see how the mine water treatment scheme is progressing, explore the site in 3D, and share your ideas on landscaping and screening.

Whether you’re curious about the engineering or passionate about the environment, the team and I would love to meet you for a chat over a cup of tea. Don’t miss this opportunity to help shape a project that’s designed to benefit the area for generations to come.

Over the next few months

  • site levelling will continue after the retaining walls are in place
  • piling works will be followed by the placing of concrete foundations
  • construction will start on the walls of the treatment building

The scheme, funded by the Department for Energy Security and Net Zero, is being built to clean water coming from the former Bilston Glen colliery, which has been discharging through a historical mine passageway called Old Fordell adit, also known locally as Junkies Adit.

This has been turning stretches of the River South Esk orange, as high levels of dissolved iron, picked up from the extensive network of old mine workings, becomes solid when it mixes with air and settles out of the water.

Our work is designed to help the river recover naturally, restoring the habitat for aquatic life, improving biodiversity and enhancing the area’s natural beauty.

📍 Dalkeith Library, 2 White Hart Street, EH22 1AE
📅 25 September 2025
🕐 1pm to 7pm

This follows on from a series of events in 2024 and you can sign up for updates on the project here.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email

Related News

From Startup to Space Oxford Space Systems’ Journey to Oberon – Case study

9 September 2025

Lord Coaker DSEI 2025 Opening Keynote Speech

9 September 2025

Russia’s strikes on Kyiv make a mockery of efforts to end its war in Ukraine UK statement to OSCE Special Permanent Council

9 September 2025

Preparing for pEPR year 1 invoicing key information for liable producers

9 September 2025

UKDI ASW Spearhead Enhances Merlin and Sonar Capabilities through Rapid Innovation – Case study

9 September 2025

Minister for Defence Procurement and Industry, Luke Pollard, statement on Defence Industrial Strategy

9 September 2025
Top News

From Startup to Space Oxford Space Systems’ Journey to Oberon – Case study

9 September 2025

link road from A13 eastbound to A1089 southbound | Eastbound | Road Works

9 September 2025

College football player kicked off team for ‘stealing designer bag with $228k Rolex and $25K worth of clothes’

9 September 2025

Subscribe to Updates

Get the latest UK news and updates directly to your inbox.

© 2025 UK Times. All Rights Reserved.
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact Us

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version