UK TimesUK Times
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
What's Hot

Arrest after man on round-the-world trip has motorbike stolen | UK News

9 September 2025

RFK Jr.’s latest ‘Make America Healthy Again’ report calls for more scrutiny of vaccines and autism – UK Times

9 September 2025

A30 eastbound access from A3047 near Camborne (east) | Eastbound | Road Works

9 September 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
UK TimesUK Times
Subscribe
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
UK TimesUK Times
Home » MVV Environmental gets permit for Canford energy from waste site
Money

MVV Environmental gets permit for Canford energy from waste site

By uk-times.com11 June 2025No Comments2 Mins Read
Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
Share
Facebook Twitter LinkedIn Pinterest Email

Following extensive public consultation, the Environment Agency has granted an environmental permit to the operators of a proposed energy from waste site in Poole, Dorset today.

In reaching the decision, after considering all feedback from the local community and interested groups, the agency agreed that MVV Environmental Ltd, of Canford Resource Park, Arena Way, Magna Road, Poole, Dorset, had met all of the necessary criteria required for the environmental permit to be issued.

A spokesperson for the Environment Agency said

We have carefully considered all of the submissions and feedback we received during our public consultations, and we thank everyone who took the time to contact us with their views.

This permit will ensure that robust levels of environmental protection are applied. Our permitting decision process is objective and based on the applicant demonstrating they will meet the legal requirements outlined in the permit.

Where an application meets the requirements of the Environmental Permitting (England and Wales) Regulations (2016) the agency must issue a permit. An environmental permit sets the conditions which MVV Environmental Ltd must adhere to when operating the site.  It covers the management and operation of the site and the control and monitoring of emissions.    

When the Environment Agency considers a permit application, it reviews the design of the proposed site, how it will be operated, the emissions it will generate (to air, water and land) and whether it will meet the required standards. Partner organisations, including the UK Health Security Agency, are also consulted as part of the process.  

Issues such as suitability of the location, operating hours and traffic management are matters for the planning authority, not the Environment Agency. The Environment Agency can only consider issues covered by the environmental permit and can only refuse a permit application based on technical information.   

The planning process and permitting process are separate and neither one depends on the other. The Environment Agency can issue a permit without planning approval, and planning approval can be issued without a permit decision. However, MVV Environment Ltd cannot start operating before both have been granted.

The final permit and decision document can be viewed online and also on our public register.

You can also request these documents by calling our Customer Contact Centre on 03706 506 506 or by emailing [email protected].

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email

Related News

Bridget Phillipson speech to TUC conference, 2025

9 September 2025

£2 billion of military support for Ukraine secured through UK-led initiative

9 September 2025

UN peace operations are a critical and unique tool for advancing international peace and security UK statement at the UN Security Council

9 September 2025

General Sir Jim Hockenhull’s DSEI 2025 Keynote Speech

9 September 2025

UK to target those profiting from child sexual abuse

9 September 2025

Millions of people to benefit from healthcare on their doorstep

9 September 2025
Top News

Arrest after man on round-the-world trip has motorbike stolen | UK News

9 September 2025

RFK Jr.’s latest ‘Make America Healthy Again’ report calls for more scrutiny of vaccines and autism – UK Times

9 September 2025

A30 eastbound access from A3047 near Camborne (east) | Eastbound | Road Works

9 September 2025

Subscribe to Updates

Get the latest UK news and updates directly to your inbox.

© 2025 UK Times. All Rights Reserved.
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact Us

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version