UK TimesUK Times
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
What's Hot

A38 northbound between A6 and A61 near Derby | Northbound | Congestion

8 September 2025

What is a bay window? Benefits, costs and design ideas – UK Times

8 September 2025

Link road from the M60 anti-clockwise to the M62 J18 roundabout | Anti-Clockwise | Congestion

8 September 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
UK TimesUK Times
Subscribe
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
UK TimesUK Times
Home » Manchester News – £2m Manchester highways blitz set to take place ahead of winter weather
News

Manchester News – £2m Manchester highways blitz set to take place ahead of winter weather

By uk-times.com8 September 2025No Comments3 Mins Read
Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
Share
Facebook Twitter LinkedIn Pinterest Email

A highways maintenance blitz is due to take place during September to ensure Manchester roads are future-proofed for the next decade and more. 

When we spoke to Mancunians about our highways network they told us that they wanted roads and pavements up to standard and for them to stay that way. 



As part of our commitment to “you say, we do” a large-scale, £1.93m resurfacing programme is set to run throughout September with 53 roads throughout Manchester due to be improved. 



In many cases the roads chosen will not be entirely degraded, however the point of this work is to prevent issues arising before they have a chance to. As we all know winter and the wet cold weather it brings is the cause of a large number of issues to the road network, so by putting a protective barrier in place ahead of time we are nipping in the bud potential future issues. 



The work being carried out will take place in two stages:


 

Surface Dressing – the area is sprayed with bitumen while stone chips are pressed into the surface with rollers. More chips are then added to the surface to ensure an even cover. The excess chips are swept away; however some will remain and there will be a temporary lowered speed limit until they’re gone – roughly four to five days 



Sealing – also known as the ‘Kiely Lock process’ this phase of the resurfacing work involves spraying a sealant that locks in the excess chips and helps to prevent water getting access to the lower sections of the road 



This type of resurfacing can prevent additional maintenance needing to take place for up to ten years. 



Work will take place across a number of neighbourhoods in Manchester, with a full list of the chosen streets available on our website. 



The planned improvements will start on Tuesday, 16 September and will continue until Saturday, 27 September. 



Councillor Tracey Rawlins, Executive Member for Clean Air, Environment and Transport, said: “We know that the cold and wet of winter puts additional stress on our roads, add in freezing temperatures and we have a recipe that can make short work of the road surface. 

“This is why we’re mobilising now to ensure that we can protect as many roads as possible which not only saves the taxpayer money in the long term, but it makes our journeys quicker and safer. 



“Over the past year we have invested heavily in improvements to our highways network as we know from our residents’ feedback it’s one of the issues most important to them. We are confident that this programme of works will be a net positive for our residents and I’d like to thank them ahead of time for their patience as we futureproof our roads for the coming decade.” 

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email

Related News

A38 northbound between A6 and A61 near Derby | Northbound | Congestion

8 September 2025

What is a bay window? Benefits, costs and design ideas – UK Times

8 September 2025

Link road from the M60 anti-clockwise to the M62 J18 roundabout | Anti-Clockwise | Congestion

8 September 2025

A34 northbound within the A303 junction after A303 eastbound exit | Northbound | Congestion

8 September 2025

Trump must pay $83 million to E Jean Carroll after ‘egregious’ defamation case, appeals court rules – UK Times

8 September 2025

A40 westbound between A48 and A4136 | Westbound | Road Works

8 September 2025
Top News

A38 northbound between A6 and A61 near Derby | Northbound | Congestion

8 September 2025

What is a bay window? Benefits, costs and design ideas – UK Times

8 September 2025

Link road from the M60 anti-clockwise to the M62 J18 roundabout | Anti-Clockwise | Congestion

8 September 2025

Subscribe to Updates

Get the latest UK news and updates directly to your inbox.

© 2025 UK Times. All Rights Reserved.
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact Us

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version