UK TimesUK Times
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
What's Hot

M4 westbound between J12 and J13 | Westbound | Vehicle Fire

15 July 2025

Lineker takes top spot on BBC earnings for eighth year running | UK News

15 July 2025

Why the UK is lagging behind other countries on measles vaccinations – UK Times

15 July 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
UK TimesUK Times
Subscribe
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
UK TimesUK Times
Home » Greater Manchester tram disruption update as £150m work continues | Manchester News
News

Greater Manchester tram disruption update as £150m work continues | Manchester News

By uk-times.com15 July 2025No Comments3 Mins Read
Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
Share
Facebook Twitter LinkedIn Pinterest Email
Lynette Horsburgh

News, Greater Manchester

Ethan Davies

Local Democracy Reporting Service

 A yellow Metrolink tram enters a station.

The improvement works on Aytoun Street and Auburn Street will start on Thursday

More disruption is coming to the Metrolink tram network in Manchester this summer as part of its £150m upgrade.

Passengers have faced disruption for weeks in the city centre as Transport for Greater Manchester (TfGM) began replacing older sections of tram track between Piccadilly Gardens and Piccadilly station.

TfGM bosses said the project was “two-thirds complete” and have named the date when roadworks will move towards the railway station and new diversions will be in place for motorists.

Engineering works are set to move on from Piccadilly Gardens and Portland Street to Aytoun Street and Auburn Street, the Local Democracy Reporting Service said.

How long will the work take?

The works on Aytoun Street and Auburn Street will start on Thursday and will continue until 10 August.

What disruption will it cause?

It means the new “traffic management measures” will be in place for Aytoun Street, as it is an area where tram tracks meet the road so it will be closed off completely.

The measures include:

  • A signed diversion route along Minshull Street, Portland Street, Piccadilly, Gore Street, and Chatham Street
  • The Portland Street bus lane will be temporarily suspended eastbound, towards Newton Street, so all traffic will be able to use that stretch of road while the works are carried out
  • Chatham Street will be temporarily made two-way, with the ‘no entry’ from Piccadilly lifted for the works
  • To allow local access to Aytoun Street, temporary two-way traffic access will be allowed on parts of Aytoun Street and Auburn Street where there is usually only one-way access

What does it mean for tram users?

Tram passengers – including those heading to the final Oasis gigs in Heaton Park – are also facing disruption.

Metrolink service changes in the city centre includes:

  • The Altrincham and Bury lines will not stop at Piccadilly Gardens or Piccadilly station
  • Altrincham and Bury trams will run via Market Street
  • All trams from Ashton-under-Lyne and the Etihad Campus will terminate at Piccadilly station, with signs in place encouraging passengers to walk to Market Street to continue their journey, or use the city centre free bus
  • All trams from Eccles, including those going via MediaCityUK, will run to Victoria via Market Street
  • The MediaCityUK to Etihad Campus peak time services will not run during the engineering works

Metrolink said there would be extra double trams on the Eccles – Victoria via MediaCityUKservice.

What are the other planned tram works outside the city centre?

Other tram works are also taking place outside the city centre including:

  • Essential engineering works at Pomona, and on the Eccles line, on 2-10 August means no tram service will operate on the Eccles via MediaCityUK line or between Cornbrook and Wharfside
  • Services on the Trafford Park line will only operate between Wharfside and the Trafford Centre

TfGM said a bus replacement service would operate between Eccles and Piccadilly via Wharfside during the closure, serving all the affected stops.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email

Related News

M4 westbound between J12 and J13 | Westbound | Vehicle Fire

15 July 2025

Lineker takes top spot on BBC earnings for eighth year running | UK News

15 July 2025

Why the UK is lagging behind other countries on measles vaccinations – UK Times

15 July 2025

A1 southbound between B6324 and A69 | Southbound | Broken down vehicle

15 July 2025

BBC films drone dropping package into HMP Wandsworth | UK News

15 July 2025

US citizen granted Russian passport after spying for the Kremlin in Ukraine – UK Times

15 July 2025
Top News

M4 westbound between J12 and J13 | Westbound | Vehicle Fire

15 July 2025

Lineker takes top spot on BBC earnings for eighth year running | UK News

15 July 2025

Why the UK is lagging behind other countries on measles vaccinations – UK Times

15 July 2025

Subscribe to Updates

Get the latest UK news and updates directly to your inbox.

© 2025 UK Times. All Rights Reserved.
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact Us

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version