UK TimesUK Times
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
What's Hot
Strikes on alleged drug boats kill 5, leave 1 survivor in eastern Pacific, US military says – UK Times

Strikes on alleged drug boats kill 5, leave 1 survivor in eastern Pacific, US military says – UK Times

13 April 2026

M11 southbound within J7 | Southbound | Congestion

13 April 2026
American athletics star says Gout Gout’s record-breaking run is a LIE: ‘This is as fake as it gets’

American athletics star says Gout Gout’s record-breaking run is a LIE: ‘This is as fake as it gets’

13 April 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
UK TimesUK Times
Subscribe
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
UK TimesUK Times
Home » Gas main replacement work on Harlescott Lane, Shrewsbury
News

Gas main replacement work on Harlescott Lane, Shrewsbury

By uk-times.com13 April 2026No Comments2 Mins Read
Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
Share
Facebook Twitter LinkedIn Pinterest Email
08/04/2026 – Permalink Related topics: Highways, transport and environmental maintenance / Partner organisations

A one-way road closure – then temporary traffic lights – will be in place on Harlescott Lane in Shrewsbury from 27 April to 2 June [2026] for gas main replacement work by Cadent Gas.

Work will take place along Harlescott Lane between the junction with Vanguard Way and the junction with Harlescott Crescent. As the work will be in close proximity to the level crossing, a one way road closure will be in place from the Lancaster Road junction, preventing traffic from travelling towards Harlescott Crossroads. In conjunction with this closure, Vanguard Way will also be closed at the mini roundabout.

During the closures, fully signed diversion routes will be in place and access to residential properties and businesses will be maintained

The road closures will be in operation for the first two weeks of the work. Once operatives have completed the section of work within the closed off area, the remaining phases will be carried out under temporary traffic lights, with work continuing away from the level crossing towards Harlescott Crescent.

The temporary traffic signals will be manually controlled by a traffic management operative between 7am and 7pm each day to help minimise delays and maintain traffic flow.

Affected residents and businesses will receive advance notification, and advance warning signs will be installed on site two weeks prior to the scheme commencing to ensure road users are fully informed.

Shropshire Council has been working closely with both Cadent Gas and Network Rail to agree a method of working that minimises disruption as far as possible.

The proposed dates may be subject to change, as they are dependent on Cadent Gas obtaining the required Basic Asset Protection Agreement (BAPA) from Network Rail.

The work is being undertaken in advance of proposed highway resurfacing in the area.

Share this page

mailto:?subject=Gas main replacement work on Harlescott Lane, Shrewsbury&body=https%3A%2F%2Fnewsroom.shropshire.gov.uk%2F2026%2F04%2Fgas-main-replacement-work-on-harlescott-lane-shrewsbury%2F

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email

Related News

Strikes on alleged drug boats kill 5, leave 1 survivor in eastern Pacific, US military says – UK Times

Strikes on alleged drug boats kill 5, leave 1 survivor in eastern Pacific, US military says – UK Times

13 April 2026

M11 southbound within J7 | Southbound | Congestion

13 April 2026
European-style insurance model will not fix NHS problems, new report says – UK Times

European-style insurance model will not fix NHS problems, new report says – UK Times

13 April 2026
First time buyers ‘paid estimated £307m extra in stamp duty since relief ended’ – UK Times

First time buyers ‘paid estimated £307m extra in stamp duty since relief ended’ – UK Times

13 April 2026
At 100 days rally, Mamdani celebrates and charts a course toward city-run grocery stores – UK Times

At 100 days rally, Mamdani celebrates and charts a course toward city-run grocery stores – UK Times

13 April 2026
Some older people having to ‘unretire’ due to financial pressures, survey finds – UK Times

Some older people having to ‘unretire’ due to financial pressures, survey finds – UK Times

13 April 2026
Top News
Strikes on alleged drug boats kill 5, leave 1 survivor in eastern Pacific, US military says – UK Times

Strikes on alleged drug boats kill 5, leave 1 survivor in eastern Pacific, US military says – UK Times

13 April 2026

M11 southbound within J7 | Southbound | Congestion

13 April 2026
American athletics star says Gout Gout’s record-breaking run is a LIE: ‘This is as fake as it gets’

American athletics star says Gout Gout’s record-breaking run is a LIE: ‘This is as fake as it gets’

13 April 2026

Subscribe to Updates

Get the latest UK news and updates directly to your inbox.

Recent Posts

  • Strikes on alleged drug boats kill 5, leave 1 survivor in eastern Pacific, US military says – UK Times
  • M11 southbound within J7 | Southbound | Congestion
  • American athletics star says Gout Gout’s record-breaking run is a LIE: ‘This is as fake as it gets’
  • European-style insurance model will not fix NHS problems, new report says – UK Times
  • First time buyers ‘paid estimated £307m extra in stamp duty since relief ended’ – UK Times

Recent Comments

No comments to show.
© 2026 UK Times. All Rights Reserved.
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact Us

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version