UK TimesUK Times
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
What's Hot

A5 northbound at a minor junction between B4100 and A4146 near Bletchley (south) | Northbound | Road Works

26 June 2026
Billionaire Leon Black defends 8M paid to Epstein: ‘I knew Jekyll. I didn’t know Hyde’ – UK Times

Billionaire Leon Black defends $158M paid to Epstein: ‘I knew Jekyll. I didn’t know Hyde’ – UK Times

26 June 2026

How transparent are the royals being about money? | UK News

26 June 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
UK TimesUK Times
Subscribe
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
UK TimesUK Times
Home » CORWM visits Dungeness A and B
Money

CORWM visits Dungeness A and B

By uk-times.com26 June 2026No Comments2 Mins Read
Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
CORWM visits Dungeness A and B
Share
Facebook Twitter LinkedIn Pinterest Email

As part of our work to analyse the management of radioactive waste across various facilities in the UK, CoRWM spent a day visiting the Dungeness A and B nuclear power stations in March 2026. The Dungeness power stations are located next to the coast on Romney Marsh in Kent. The area is of international importance for its topography, plant and invertebrate communities and Dungeness, Romney Marsh and Rye Bay have been designated as a Special Protection Area.

Dungeness has 2 power stations Dungeness A and B. Dungeness A is a legacy Magnox power station that was connected to the grid in 1965. It had 2 reactors that stopped operation on 31 December 2006. The reactors were designed to operate for 25 years but lasted far beyond this. Dungeness B was an Advanced Gas-cooled Reactor (AGR), operated by EDF Energy. It contained 2 reactors which began operation in 1983 and 1985. The reactors were closed for maintenance in 2018, with an announcement in June 2021 that the reactors would move into their defueling phase.

Both reactor facilities are highly exposed to weather conditions, and it is an area where these conditions can be extreme. Whilst it is not an issue for nuclear safety and security, during the tour, it was clear that the combination of high winds and its coastal location meant that salt-water was a particular challenge, with corrosion having a significant impact on infrastructure.

At Dungeness A we were able to see a range of facilities, including the Wet Waste Transfer Facility, the Advanced Vacuum Drying System and the Package Handling Facility. Some of which had been recently constructed to support decommissioning, which is now progressing well. At Dungeness B we were able to view the tops of the reactors from a viewing gallery, as well as see around the turbine hall.

Our analysis of the power stations at Dungeness will feed into CoRWM’s wider stream of work on waste management, which has seen us visit many other nuclear facilities in the UK over the last few months, such as Sizewell, Dounreay and Sellafield.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email

Related News

World Cup what’s the price of being there?

World Cup what’s the price of being there?

26 June 2026
CORWM visits Dungeness A and B

UK Government bolsters Ukraine’s economic recovery, with World Bank approving $1 billion in UK-backed finance

26 June 2026
CORWM visits Dungeness A and B

Britain’s food and farming trade attachés unlock £80m in new export opportunities 

26 June 2026
CORWM visits Dungeness A and B

SIA inspections uncover public safety risks in night-time economy

26 June 2026
A new Prime Minister – a new market story?

A new Prime Minister – a new market story?

26 June 2026
CORWM visits Dungeness A and B

CORWM visits Sizewell A and Sizewell B

26 June 2026
Top News

A5 northbound at a minor junction between B4100 and A4146 near Bletchley (south) | Northbound | Road Works

26 June 2026
Billionaire Leon Black defends 8M paid to Epstein: ‘I knew Jekyll. I didn’t know Hyde’ – UK Times

Billionaire Leon Black defends $158M paid to Epstein: ‘I knew Jekyll. I didn’t know Hyde’ – UK Times

26 June 2026

How transparent are the royals being about money? | UK News

26 June 2026

Subscribe to Updates

Get the latest UK news and updates directly to your inbox.

Recent Posts

  • A5 northbound at a minor junction between B4100 and A4146 near Bletchley (south) | Northbound | Road Works
  • Billionaire Leon Black defends $158M paid to Epstein: ‘I knew Jekyll. I didn’t know Hyde’ – UK Times
  • How transparent are the royals being about money? | UK News
  • M56 eastbound between J4 and J3 | Eastbound | Congestion
  • Iran and Egypt desperately try to avoid questions about playing in World Cup’s ‘Pride Match’ after they tried to get it canceled

Recent Comments

No comments to show.
© 2026 UK Times. All Rights Reserved.
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact Us

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version