UK TimesUK Times
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
What's Hot

A2 westbound between B255 and M25/A282 | Westbound | Overturned Vehicle

21 August 2025

Kansas City Chiefs trade Skyy Moore to San Francisco 49ers as they cut ties with two-time Super Bowl winner

21 August 2025

New Zealand will spend $1.6B on military aircraft in a plan to double the defense budget – UK Times

21 August 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
UK TimesUK Times
Subscribe
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
UK TimesUK Times
Home » An 1800-foot bridge in Missouri is available for free. There’s just one catch – UK Times
News

An 1800-foot bridge in Missouri is available for free. There’s just one catch – UK Times

By uk-times.com20 August 2025No Comments3 Mins Read
Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
Share
Facebook Twitter LinkedIn Pinterest Email

The latest headlines from our reporters across the US sent straight to your inbox each weekday

Your briefing on the latest headlines from across the US

Your briefing on the latest headlines from across the US

Evening Headlines

The Missouri Department of Transportation is preparing to replace the mid-20th-century Theodosia Bridge, but rather than demolish it outright, officials are offering it up free of charge to any eligible entity willing to take it on.

The catch? Whoever wants it must bear the cost of its relocation.

Built in 1951, the over 1,800-foot-long structure spans Bull Shoals Lake along US Highway 160 and boasts a distinctive design of 10 riveted camelback through-truss spans, each about 181 feet in length.

The bridge features concrete abutments, wingwalls, and column piers with web-walls, with a deck surfaced in concrete and topped with bituminous. If someone takes the bridge, they may have to agree to rules that protect its historic design and keep it in good condition.

Eligible applicants, including government agencies, nonprofit organizations, and private individuals, have until January 9, 2026, to submit comprehensive proposals to MoDOT’s Historic Preservation Section. These plans must outline how the bridge will be dismantled, relocated, and reused, including cost estimates and the intended future application.

Built in 1951, the historic Theodosia Bridge spans Bull Shoals Lake at 1,816 feet

Built in 1951, the historic Theodosia Bridge spans Bull Shoals Lake at 1,816 feet (Missouri Department of Transportation)

To ease the financial burden of relocation, MoDOT is offering reimbursement equivalent to the demolition costs, provided the recipient undertakes the removal themselves. However, this funding is not available if MoDOT removes and stores the bridge. Applicants must remove it themselves to qualify.

Recipients are also encouraged to explore alternative funding sources, including the Recreational Trails Program through Missouri State Parks and MoDOT’s Transportation Alternatives Program.

Locally, interest in preserving and repurposing the bridge has been high, especially for use in low-water crossings, Ozark Radio News reports. However, Ozark County officials fear that relocation expenses could run into the millions, making such a project financially unfeasible under the current budget.

The Independent has contacted MoDOT for comment.

Government agencies, nonprofits, and even private individuals can apply to relocate the bridge, but they must submit full proposals to MoDOT’s Historic Preservation Section by January 9, 2026

Government agencies, nonprofits, and even private individuals can apply to relocate the bridge, but they must submit full proposals to MoDOT’s Historic Preservation Section by January 9, 2026 (Missouri Department of Transportation)

MoDOT plans to replace the bridge in the future, but construction is still years away. For now, the department is studying the land and environment to make sure the project is safe and practical.

Preliminary site work, including surveys and data collection, is underway, with environmental surveys expected to conclude by August 2026. Preliminary cost projections estimate that the installation of a new bridge could approach $100.4 million.

Interested entities can visit MoDOT’s Free Bridges portion of its website for a proposal checklist.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email

Related News

A2 westbound between B255 and M25/A282 | Westbound | Overturned Vehicle

21 August 2025

New Zealand will spend $1.6B on military aircraft in a plan to double the defense budget – UK Times

21 August 2025

M1 J29a northbound exit | Northbound | Road Works

21 August 2025

Thailand requires banks to cap most online transfers at $1,500 daily to thwart scammers – UK Times

21 August 2025

A14 westbound within J3 | Westbound | Road Works

21 August 2025

Brazilian police accuse ex-President Bolsonaro of planning to flee to Argentina seeking asylum – UK Times

21 August 2025
Top News

A2 westbound between B255 and M25/A282 | Westbound | Overturned Vehicle

21 August 2025

Kansas City Chiefs trade Skyy Moore to San Francisco 49ers as they cut ties with two-time Super Bowl winner

21 August 2025

New Zealand will spend $1.6B on military aircraft in a plan to double the defense budget – UK Times

21 August 2025

Subscribe to Updates

Get the latest UK news and updates directly to your inbox.

© 2025 UK Times. All Rights Reserved.
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact Us

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version