UK TimesUK Times
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
What's Hot

A303 eastbound between A350 and A36 | Eastbound | Road Works

17 December 2025

Katie Price’s ex-husband Kieran Hayler denies raping girl, 13 | UK News

17 December 2025
Jack Smith set for private interview with lawmakers about Trump investigations – UK Times

Jack Smith set for private interview with lawmakers about Trump investigations – UK Times

17 December 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
UK TimesUK Times
Subscribe
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
UK TimesUK Times
Home » Report 09/2025 Buffer stop collision at London Bridge station
Money

Report 09/2025 Buffer stop collision at London Bridge station

By uk-times.com17 December 2025No Comments4 Mins Read
Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
Report 09/2025 Buffer stop collision at London Bridge station
Share
Facebook Twitter LinkedIn Pinterest Email

PDF, 6.03 MB, 38 pages

This file may not be suitable for users of assistive technology.


Request an accessible format.

If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Summary

At around 1545 on Friday 13 December 2024, a passenger train operated by Southern Railway struck the buffer stop on arrival in platform 12 at London Bridge station at a speed of around 2.3 mph (3.7 km/h). There were no reported injuries to the driver or to the passengers on the train and there was very minor damage caused to the train and railway infrastructure.

The train had been travelling at 13.3 mph (21.4 km/h) when it entered the platform and its speed gradually reduced as it progressed towards the buffer stop. When the train was around 3.5 metres from the buffer stop and travelling at a speed of 6.8 mph (10.9 km/h) the driver made an emergency brake application. Despite this, there was insufficient distance remaining to prevent the collision.

The accident occurred because the driver of the train did not apply the brakes in time on approach to the buffer stops, almost certainly because they experienced a microsleep, due to fatigue. There are several factors that may have contributed to the driver’s fatigue. Two probable causal factors in the accident were that the base duty roster was constructed in a way that increased the risk of fatigue and that the driver had also worked many of their rostered rest days in the period up to the accident, further increasing the risk of fatigue. A possible causal factor was that the driver had less than their normal amount of sleep the night before the accident.

A further causal factor was that none of the engineered protection systems fitted to the train intervened to prevent the collision. The Train Protection and Warning System fitted on approach to the buffer stops did not automatically apply the train’s brakes because the train was travelling below the set intervention speed. Other safety systems fitted on board the train could not detect the short loss of driver alertness that occurred.

A probable underlying factor to the accident was that the management of fatigue risk by Govia Thameslink Railway, the company operating the Southern Railway franchise, was not sufficiently effective and that it had not adopted some elements of industry good practice in fatigue risk management. A second underlying factor was that there are no safety systems currently fitted to mainline trains which can detect and mitigate short losses in driver alertness.

As part of its investigation, RAIB observed that the actual hours that staff work were not considered in the management of Govia Thameslink Railway safety-critical staff with medical conditions when external advice was being sought as to their fitness for work.

Recommendations

RAIB has made two recommendations as a result of this investigation, one addressed to Govia Thameslink Railway to improve its fatigue management process and to follow industry best practice. The other is addressed to the Rail Safety and Standards Board, in consultation with the rail industry, to provide guidance when seeking external advice about medical conditions and working hours that may increase the risk of fatigue in safety-critical staff.

Notes to editors

  1. The sole purpose of RAIB investigations is to prevent future accidents and incidents and improve railway safety. RAIB does not establish blame, liability or carry out prosecutions.

  2. RAIB operates, as far as possible, in an open and transparent manner. While our investigations are completely independent of the railway industry, we do maintain close liaison with railway companies and if we discover matters that may affect the safety of the railway, we make sure that information about them is circulated to the right people as soon as possible, and certainly long before publication of our final report.

  3. For media enquiries, please call 01932 440015.

Newsdate 17 December 2025

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email

Related News

Report 09/2025 Buffer stop collision at London Bridge station

War-scarred Union Flag from the Battle of Trafalgar at risk of leaving the UK

17 December 2025
Report 09/2025 Buffer stop collision at London Bridge station

New VAWG strategy will leave offenders with nowhere to hide

17 December 2025
Horizon Europe info days in 2026

Horizon Europe info days in 2026

17 December 2025
Report 09/2025 Buffer stop collision at London Bridge station

Single Construction Regulator to ensure standards across sector

17 December 2025
Report 09/2025 Buffer stop collision at London Bridge station

UKAEA and NDA strengthen collaborative approach to decommissioning

17 December 2025
Report 09/2025 Buffer stop collision at London Bridge station

UK meets with international coalition to keep space safe

17 December 2025
Top News

A303 eastbound between A350 and A36 | Eastbound | Road Works

17 December 2025

Katie Price’s ex-husband Kieran Hayler denies raping girl, 13 | UK News

17 December 2025
Jack Smith set for private interview with lawmakers about Trump investigations – UK Times

Jack Smith set for private interview with lawmakers about Trump investigations – UK Times

17 December 2025

Subscribe to Updates

Get the latest UK news and updates directly to your inbox.

© 2025 UK Times. All Rights Reserved.
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact Us

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version