UK TimesUK Times
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
What's Hot

Ryan Gosling and faceless alien named Rocky wow crowd at ‘Project Hail Mary’ Comic-Con panel – UK Times

27 July 2025

link road from M62 J12 eastbound to M60 J12 clockwise | Clockwise | Road Works

27 July 2025

Hilarious moment tennis star Anna Kalinskaya’s pet dog storms the court during DC Open

27 July 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
UK TimesUK Times
Subscribe
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
UK TimesUK Times
Home » Summer 2025 ORR newsletter | Office of Rail and Road
News

Summer 2025 ORR newsletter | Office of Rail and Road

By uk-times.com26 July 2025No Comments5 Mins Read
Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
Share
Facebook Twitter LinkedIn Pinterest Email

Top stories

Annual reports

ORR has released its four annual reports covering Network Rail, Industry-wide Health and Safety; National Highways, and Consumers. 

Rail safety performance remains generally strong but industry must keep focus on safety throughout rail reform

ORR Inspector in PPE on a site visit at a level crossing.

Our annual report on health and safety focuses heavily this year on Network Rail’s assets. Substantial progress was made in addressing overdue assessments for structures and drainage assets, although this has been achieved following our focussed attention.

The report underscores that safety remains the railway’s most critical obligation, especially as the industry undergoes its most significant reform in a generation with the creation of Great British Railways. The report stresses the importance of strong leadership, collaboration, and proactive risk management to maintain safety standards. Noting ORR’s enforcement actions and oversight have been instrumental in addressing these issues. The report notes several high-potential risk events, particularly at level crossings, signals passed at danger, and overspeeding. It also highlights a freight train derailment in Audenshaw that exposed weaknesses in maintenance arrangements.  

The report also calls for clear accountability and visible safety leadership to ensure that health and safety remains a guiding principle throughout the ongoing industry reform process, while also promoting a more inclusive and resilient safety culture

The report also covers our work on welfare provision and the Improvement Notices and criminal prosecutions we concluded over the last year.  

Strong efficiency gains but £488m funding gap needs resolving  – our Annual Assessment of Network Rail

Passengers waiting for the next train on a train station platform.

Our Annual Assessment of Network Rail found that punctuality remained largely stable in the last year but cancellations reached record highs. While most cancellations were attributed to Train Operating Companies (TOCs), Network Rail missed its national targets for reliability and punctuality although these are whole industry targets. NR met national targets for its own delay minutes.

On the efficiency side, Network Rail delivered strong gains in 2024-25, achieving £325 million in savings – £63 million above target. However, the company has a significant funding gap of £488 million which we have asked it to take action to resolve.  

You can read more, including regional breakdowns.

National Highways delivers major schemes and savings but key targets missed

A three-lane traffic light roundabout with some traffic including HGVs with an overpass for through traffic. There is a background of trees and greenery against a cloudy sky.

ORR’s assessment of National Highways’ performance over the last five years noted the company opened fifty major enhancement schemes to traffic with another eleven under construction; achieved improved environmental outcomes; met targets for clearing incidents, mitigating the impact of roadworks; and maintaining the road surface in good condition..  

National Highways also made £2.2bn in efficiency savings, more than its target. This is notable in the context of high inflation during the period, and a significantly altered programme, including the National Emergency Area Retrofit scheme on all lane running smart motorways.

However, the company missed or is likely to miss five of its 12 key performance indicators, for reasons both within and outside its control.  

National Highways has however already made good progress on the improvement plan it produced following ORR action last year. We will continue to work with it in the coming period to support its contribution to driving economic growth.    

Consumer Report : A Busy Year!

It has been a busy year on the consumer front, and the Consumer Annual Report covers our main interventions in areas where we have responsibility. Among other things it includes our work:  

  • securing increased transparency for passengers on fees for tickets bought online;
  • bringing industry together to consider how to embed best practice in relation to the safety and welfare of passengers in stranded train incidents; and  
  • in relation to accessibility, consulting on a new framework for benchmarking operators’ performance in providing assistance to passengers. This will help us better target our interventions to drive improvements for passengers.  

Finally, the report considers the learnings from our report on Revenue Protection Practices, which was commissioned by the Department for Transport.

CP7 Reset

As part of our ongoing assessment of Network Rail’s economic regulation, we are currently seeking views on a revised set of the passenger train performance targets proposed for monitoring, and financial incentive parameters which will be holding Network Rail to account covering the last three years of the CP7 control period.

When PR23 concluded in April 2024  we set measures and targets for the first two years of CP7 – 1 April 2024 to 31 March 2026, with indicative targets for the final three years of the Control Period. Following modelling, we feel we have determined ambitious but realistic targets, and look forward to seeing your responses to the consultation.

The consultation closes on 5 September and we welcome your views.

ORR Annual Report and Accounts celebrates our work in 2024 to 2025  

Our Annual Report and Accounts was published on 15 July, recapping ORR’s work across 2024 and 2025.

Podcasts

The Rail and Road Pod Episode 26: Lego and dinosaurs – ORR engineers on their chosen careers

To mark the recent International Women in Engineering Day, four ORR engineers recall their career paths, their work at ORR and give advice on those interested in joining their profession.

Statistics

So far in July we have published the following statistics:   

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email

Related News

Ryan Gosling and faceless alien named Rocky wow crowd at ‘Project Hail Mary’ Comic-Con panel – UK Times

27 July 2025

link road from M62 J12 eastbound to M60 J12 clockwise | Clockwise | Road Works

27 July 2025

Man with mental health issues found naked in Minnesota Capitol, raising new security concerns – UK Times

27 July 2025

A663 northbound between A62 and A6104 | Northbound | Road Works

27 July 2025

M57 southbound between J4 and J3 | Southbound | Road Works

27 July 2025

Luke Littler hits stunning nine-dart finish in semi-final win over Josh Rock – UK Times

27 July 2025
Top News

Ryan Gosling and faceless alien named Rocky wow crowd at ‘Project Hail Mary’ Comic-Con panel – UK Times

27 July 2025

link road from M62 J12 eastbound to M60 J12 clockwise | Clockwise | Road Works

27 July 2025

Hilarious moment tennis star Anna Kalinskaya’s pet dog storms the court during DC Open

27 July 2025

Subscribe to Updates

Get the latest UK news and updates directly to your inbox.

© 2025 UK Times. All Rights Reserved.
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact Us

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version