UK TimesUK Times
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
What's Hot

Andorra vs England live: Live score and updates from World Cup qualifier – UK Times

7 June 2025

M25 anti-clockwise between J7 and J6 | Anti-Clockwise | AuthorityOperation

7 June 2025

Leicester woman vows to fight ‘political’ camping table fine | UK News

7 June 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
UK TimesUK Times
Subscribe
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
UK TimesUK Times
Home » Consultation launched into permit ‘minded to’ decision
Money

Consultation launched into permit ‘minded to’ decision

By uk-times.com6 June 2025No Comments3 Mins Read
Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
Share
Facebook Twitter LinkedIn Pinterest Email

Valencia Waste Management applied for an environmental permit to increase the permitted quantities for treatment of mixed non-hazardous waste at its Pilsworth South waste management facility at Pilsworth Road.

After reviewing 291 responses from the original consultation last year the Environment Agency is ‘minded to’ issue the environmental permit.

This means after exploring the issues and concerns that have been raised, it can’t find any reason to refuse the application, but is yet to make a final decision.

A draft permit document and draft decision document is on the Environment Agency’s Citizen Space page.

The consultation into the ‘minded to’ decision documents will close at the end of Thursday 3 July 2025.

EA wants to ‘hear people’s views’

Nigel Glasgow, Area Environment Manager for the Environment Agency in Greater Manchester,

We have carefully considered all the documents provided to us by Valencia Waste Management as well as the consultation comments and currently can’t find any reason to refuse the permit application.

We want to hear people’s views on the draft decision and those interested are encouraged to view the draft documents and provide comments.

We will make our final decision once we have reviewed the responses to this consultation.

The purpose of the treatment is to recover the metals, wood and plastic for recycling, and to prepare the combustible wastes for use in energy recovery off-site.

The residual waste will, where possible, be used in landfill engineering, otherwise it will be disposed of in the landfill.

The treatment will take place in a purpose-built building with specialised equipment capable of treating up to 250,000 tonnes per year.

Legal requirements

The original consultation into this application took place ended on 23 August 2024.

The Environment Agency may only refuse a permit application if it does not meet one or more of the legal requirements under environmental legislation, including if it will have an unacceptable impact on the environment or harm human health.

If all the requirements are met, it is legally obliged to issue a permit. 

The draft decision document explains the Environment Agency’s decision-making and outlines how it has considered the comments from the original consultation. The draft permit outlines the conditions would need to meet if the permit is granted.

The Environment Agency will only issue the permit if it is satisfied the operator could comply with the permit conditions and has appropriate systems in place to operate the incinerator without causing harm to the environment, human health or wildlife.

Background

Environmental permits 

  • Environmental permits set out strict legal conditions by which an operator must comply in order to protect people and the environment. Should an environmental permit be issued, the Environment Agency has responsibility for enforcing its conditions. 
  • Our powers include enforcement notices, suspension and revocation of permits, fines and ultimately criminal sanctions, including prosecution. 
  • We may only refuse a permit if it does not meet one or more of the legal requirements under environmental legislation, including if it will have a significant impact on the environment or harm human health. If all the requirements are met, we are legally required to issue a permit. 

Consultation responses  

  • Responses to the consultation can be made electronically. 
  • People can respond directly on the website or alternatively by email to [email protected]
  • Those unable to view the documents or make representation via the consultation website or by email should contact the Environment Agency on 03708 506 506.
Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email

Related News

Prices and How to Afford it

7 June 2025

UK and India to bolster economic and migration ties as Foreign Secretary delivers on Plan for Change during visit

7 June 2025

Patients to receive reminders and test results via the NHS App

7 June 2025

One stop shop for tech could save taxpayers £1.2 billion and overhaul how government buys digital tools

7 June 2025

Illegal working enforcement soars in drive to strengthen border security

7 June 2025

Defence Secretary’s speech on D-Day 81 anniversary

6 June 2025
Top News

Andorra vs England live: Live score and updates from World Cup qualifier – UK Times

7 June 2025

M25 anti-clockwise between J7 and J6 | Anti-Clockwise | AuthorityOperation

7 June 2025

Leicester woman vows to fight ‘political’ camping table fine | UK News

7 June 2025

Subscribe to Updates

Get the latest UK news and updates directly to your inbox.

© 2025 UK Times. All Rights Reserved.
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact Us

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version