UK TimesUK Times
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
What's Hot

M6 southbound within J22 | Southbound | Accident

13 June 2025

Revealed: Leroy Sane’s STAGGERING Galatasaray salary which would be the Premier League’s second-highest – as Turkish giants confirm agreement

13 June 2025

Frank Warren names potential final foe for Derek Chisora – UK Times

13 June 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
UK TimesUK Times
Subscribe
  • Home
  • News
  • TV & Showbiz
  • Money
  • Health
  • Science
  • Sports
  • Travel
  • More
    • Web Stories
    • Trending
    • Press Release
UK TimesUK Times
Home » £2.5 billion for world-first prototype fusion energy plant
Money

£2.5 billion for world-first prototype fusion energy plant

By uk-times.com12 June 2025No Comments3 Mins Read
Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
Share
Facebook Twitter LinkedIn Pinterest Email

A record £2.5 billion of additional funding has been announced this week by the Rt Hon Rachel Reeves, Chancellor of the Exchequer, to support the development of the world’s first fusion power plant.

The new prototype plant, known as STEP (Spherical Tokamak for Energy Production) will be built at the site of the former West Burton A coal power station near Retford and Gainsborough. The site was chosen by the government in 2022 as the location for the project, with the project’s delivery expected to create over 10,000 jobs ranging from construction to operations. The announcement shows the government’s firm commitment to becoming a “clean energy superpower” by turbocharging innovation in an area that’s produced conventional power for generations.

A groundbreaking and world-first scientific endeavour, STEP works by combining hydrogen gases, deuterium and tritium, which are heated to over 150 million degrees Celsius and confined within a powerful magnetic field. The energy produced can then be used to create steam, to turn a turbine, generating electricity – just like in any conventional power plant.

Paul Methven CB, CEO of UK Industrial Fusion Solutions, the body responsible for delivering the STEP prototype fusion energy power plant, warmly welcomed the additional funding and said

The UK is the world leader in fusion energy research today, and STEP is the beacon programme that aims to take fusion from research to commercial success, generating high quality jobs, multiple spin offs and boosting the economy nationally and in the East Midlands where we will build the first plant.

Securing a global lead in such a vital new technology requires bold action; the government has rightly been bold today and we look forward to delivering the practical steps that will realise the vision of the UK leading in this exciting new sector.

The end of coal power in Nottinghamshire was marked by the closure of Ratcliffe-on-Soar Power Station in late 2024. With the creation of STEP in West Burton, Nottinghamshire’s “Megawatt Valley” will continue to be at the heart of the UK’s energy production – whilst leading the world in creating the green, sustainable energy of the future.

The record-breaking £2.5 billion of additional funding announced this week shows the government’s firm commitment to fusion as a core part of our future energy mix, and to this significant investment in the economy in Nottinghamshire and the East Midlands.

During a recent visit to the UK’s Fusion Research Campus at Culham, Energy Secretary Ed Miliband commented

After scientists first theorised over 70 years ago that it could be possible, we are now within grasping distance of unlocking the power of the sun and providing families with secure, clean, unlimited energy.

Notes to Editors

UK Industrial Fusion Solutions Ltd (UKIFS) is a wholly owned subsidiary of the UK Atomic Energy Authority (UKAEA) Group, responsible for the STEP (Spherical Tokamak for Energy Production) programme to deliver the UK’s prototype fusion energy plant.  

Targeting first operations in 2040, UKIFS will lead STEP’s integrated delivery team to design and build the prototype fusion energy plant at West Burton, a former coal-fired power station site in Nottinghamshire.

To sign-up for updates about STEP, visit step.ukaea.uk or follow our social channels @STEPtoFusion.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email

Related News

£500m boost for hydrogen to create thousands of British jobs

13 June 2025

The Foreign Secretary’s Mansion House Speech 2025

13 June 2025

Sickle cell patients to get better treatment after £9m boost

13 June 2025

Charging into the future government set to deliver over 100,000 more EV chargepoints

13 June 2025

The UK voted in favour in line with our unwavering determination to end the suffering in Gaza, bring the hostages home and move towards lasting peace UK Statement at the UN General Assembly

12 June 2025

Nuclear safeguards AUKUS statement to the IAEA Board of Governors, June 2025

12 June 2025
Top News

M6 southbound within J22 | Southbound | Accident

13 June 2025

Revealed: Leroy Sane’s STAGGERING Galatasaray salary which would be the Premier League’s second-highest – as Turkish giants confirm agreement

13 June 2025

Frank Warren names potential final foe for Derek Chisora – UK Times

13 June 2025

Subscribe to Updates

Get the latest UK news and updates directly to your inbox.

© 2025 UK Times. All Rights Reserved.
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact Us

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version